Ringwood Townhouse Development 2 townhouse (Double-storey) development including civil works and landscaping. Find Out More
Fatboy Restaurant High-end restaurant fit out with a commercial kitchen in South Yarra. Find Out More
Manchester and More and Stuff and Nonsense Fit-outs Internal fit-out and shopfront upgrade of a bedding and home décor store and novelty store at Cranbourne Shopping Centre, Victoria. Find Out More
Freeman Catholic College Bonnyrigg Refurbishment of 6 existing classrooms and the construction of a TADEC extension. Find Out More
White Night Reception Centre Extensive refurbishment of an existing reception centre into a high-end venue. From demolition of internal walls and ceilings, construction of new bars, ceilings and commercial kitchen to complete re-development of carpark and landscaping. Find Out More
Collingwood 10 Storey Apartment development Project management of a proposed 10-storey development in Collingwood on an existing client site which include concept development, feasibility studies and planning approvals. Find Out More
St Ambrose Concord West Block A refurbishment Block A Works is the refurbishment of three (3) first floor classrooms in Block A and minor alterations to two (2) other classrooms. The refurbishment works include but are not limited to: Partial internal demolition works to five (5) classrooms, Relocation of existing joinery in two (2) Classrooms, Refurbishment and fit out of five (5) classrooms including two (2) new break-out areas, Supply and installation of Joinery and Loose Furniture. Find Out More
St Ambrose Concord West New Library , classrooms and Walkway Extension This was a multiple stage project which involved the conversion of a purchased residential building into a library and learning centre and a complex first floor extension and refurbishment of existing classrooms. Find Out More
Eileen O’Connor Lewisham Heritage Refurbishment Stage 3 Works Established in 2016, Eileen O’Connor Catholic College Lewisham is the first Sydney Catholic Schools (SCS) school to address the needs of students with a moderate intellectual disability and other significant and complex learning needs. The students come from all areas of Sydney and from widely different backgrounds and cultures. Find Out More
St Joseph’s Catholic Primary School, Como Refurbishment Refurbishing classrooms and admin. Improve the quality and condition of teaching and learning areas by creating larger classrooms that have passive learning, withdrawal, and makers’ spaces. Absorb narrow corridors into classrooms to create other modes of learning. Resolve level differences between classroom blocks by introducing a wider central walkway connected by stairs and lifts and creating a vibrant Learning Street Find Out More